📡 Live on Telegram · Morning Barrel, price alerts & breaking energy news — free. Join @OilMarketCapHQ →
LIVE
BRENT CRUDE $77.75 -1.8 (-2.26%) WTI CRUDE $74.03 -1.98 (-2.6%) NAT GAS $3.14 +0 (+0%) GASOLINE $2.80 -0.03 (-1.06%) HEAT OIL $3.08 -0.07 (-2.23%) MICRO WTI $74.06 -1.95 (-2.57%) TTF GAS $41.46 -0.45 (-1.07%) E-MINI CRUDE $74.00 -2 (-2.63%) PALLADIUM $1,337.00 -26.6 (-1.95%) PLATINUM $1,761.10 -31.8 (-1.77%) BRENT CRUDE $77.75 -1.8 (-2.26%) WTI CRUDE $74.03 -1.98 (-2.6%) NAT GAS $3.14 +0 (+0%) GASOLINE $2.80 -0.03 (-1.06%) HEAT OIL $3.08 -0.07 (-2.23%) MICRO WTI $74.06 -1.95 (-2.57%) TTF GAS $41.46 -0.45 (-1.07%) E-MINI CRUDE $74.00 -2 (-2.63%) PALLADIUM $1,337.00 -26.6 (-1.95%) PLATINUM $1,761.10 -31.8 (-1.77%)
Oil & Stock Correlation

ABB Enhances BPCL’s Vadinar–Bina Pipeline with Cutting-Edge SCADA and Cybersecurity, ETEnergyworld


<p>ABB has collaborated with BPCL on several critical projects, including providing automation solutions across approximately 66% of its pipeline infrastructure.</p>
ABB has collaborated with BPCL on several critical projects, including providing automation solutions across approximately 66% of its pipeline infrastructure.

ABB India Ltd, an integrated power equipment manufacturer, on Monday said it has upgraded the automation and monitoring systems for Bharat Petroleum Corporation Limited’s (BPCL) Vadinar-Bina Pipeline (VBPL).

This 935 km cross-country oil pipeline supplies 7.80 million metric tonnes per annum (MMTPA) to the Bina refinery in Madhya Pradesh.

The project scope included a complete ABB Ability SCADAvantage system modernisation for the pipeline, the replacement of 35 Remote Terminal Units (RTU) across pumping, pigging and sectionalising valve stations, the installation of new SCADA servers at Vadinar and Bina and strengthening security and cyber resilience through network protection, system hardening and centralized monitoring.

“The project strengthened our cyber security and system resilience, greatly enhancing the reliability of the entire pipeline infrastructure,” said Rajshekhar S, Head (Pipelines), Vadinar Bina Pipeline, BPCL.

“With failover capability and disaster recovery servers implemented at both Vadinar and Bina, we now have robust support to maintain uninterrupted operations even in challenging conditions,” Rajshekhar added.

ABB has collaborated with BPCL on several critical projects, including providing automation solutions across approximately 66 per cent of its pipeline infrastructure.

“ABB executed the modernisation of the pipeline without any operational disruption, ensuring continuous flow and uninterrupted refinery operations throughout the project,” said G Balaji, SVP at ABB India’s Energy Industries division.

Published On Jan 20, 2026 at 06:29 PM IST

Join the community of 2M+ industry professionals.

Subscribe to Newsletter to get latest insights & analysis in your inbox.

All about ETEnergyworld industry right on your smartphone!



Source link

OilMarketCap provides market data and news for informational purposes only. Nothing on this site constitutes financial, investment, or trading advice. Always consult a qualified professional before making investment decisions.